About project
Waste rock dump – design validation
A tier one major metalliferous mine in Queensland that has been operating for over 20 years required RGS/Deswik to compile digital data records and then reconstruct life of mine 3D CAD models of two waste rock dumps that are nearing operational capacity. The work was required to conform to regulatory requirements associated with Progressive Rehabilitation and Closure Plan legislation.
RGS